Bidding on this auction has not started.

Please register now so you are approved to bid when auction starts.

This auction is open!

It is now possible to bid at this auction.

This auction is closed!

It is no longer possible to bid at this auction.

You are registered for this auction

You are now approved to bid at this auction.

Your auction registration is now pending

You have successfully registered for this auction, pending approval to bid. Please check your email for further information.

Your auction registration has been declined

Please contact the auctioneer for more information.

Secure Site Cabins and Building/Groundworks Materials
Timed
Venue address
Low Hall Road
Horsforth
LS18 4EW
United Kingdom

Multi-location - see lot details

Secure Site Cabins and Building/Groundworks Materials

Auction dates
Starts: 26 Sep 2016 16:00 BST
Ends from: 06 Oct 2016 10:00 BST
Auction currency
GBP
Accepted cards
There are 34 lots within this auction
Primary Category
Sorted by
We have chosen not to publish our results. Please contact us directly for any enquiries.
3 packs Extruded Flashing
Estimate
Approx 30 various lengths Drainage Pipe
Estimate
Fabricated Gates and Posts, 1700mm x 2420mm per panel
Estimate
Quantity Clayware including pipe, connectors, etc
Estimate
Part roll DPM
Lot 11
Estimate
Pallet Sets
Lot 12
Estimate
Pallet Sets
Lot 13
Estimate
Pallet Sets
Lot 14
Estimate
Pallet Sets
Lot 15
Estimate
Pallet Sets
Lot 16
Estimate
Pallet Sets
Lot 17
Estimate
Pallet Sets
Lot 18
Estimate
Part pallet various Sets
Estimate
Part pallet Sets
Estimate
2 part pallets Sets
Estimate
Concrete Chamber
Estimate
5 part Pallets Curbs, etc
Estimate
7 various sheets Polystyrene Insulation
Estimate
Quantity Flexible Pipe
Estimate
Various lengths Timber
Estimate
Quantity various Plastic Pipe, to pallet
Estimate
Quantity various Plastic Pipe, to pallet
Estimate
Quantity various Plastic Pipe, to pallet
Estimate
2 part pallets Tactile Blister Paving Slabs
Estimate
Roll Sheeting
Lot 33
Estimate
Part pallet Bricks
Estimate
Quantity Groundwork Material
Estimate
2 sacks plastic Rebar Supports
Estimate